Little Mindil under threat!
Sign up for our newsletter here: https://actionnetwork.org/forms/sign-up-for-our-save-little-mindil-newsletter
See what is current: https://planinc.org.au/news/current-campaigns/293-save-little-mindil.html
Sign the petition here: https://actionnetwork.org/petitions/save-little-mindil
Download the current handout for your street: Current Handout
NT EPA Community Comments close 2 November 2021
The Northern Territory Environment Protection Authority have opened for community comments on the Little Mindil Development.
Here is the link to the web site: https://ntepa.nt.gov.au/consultation/north-one-hotel-and-apartments
These are the NT EPA documents
First is the guidline to submitting: Public submission Guidance
This is the developers referral form: Referral Form
This is the developers referral report: Referral Report
And these are the appendix:
appendix1a-design-response-package-part1.pdf
appendix1a-design-response-package-part2.pdf
appendix1a-design-response-package-part3.pdf
appendix-1b-architectural-drawing-package-part1.pdf
appendix-1b-architectural-drawing-package-part2.pdf
appendix2-landscape-concept.pdf
appendix3-stakeholder-engagement-plan.pdf
appendix4-Environmental-risk-assessment.pdf
appendix5-preliminary-site-investigation-contamination.pdf
appendix6-biological-study.pdf
appendix7-construction-environmental-management-plan.pdf
appendix8-acid-sulphate-management-plan.pdf
appendix9-engineering-services-report.pdf
appendix10-stormwater-management-plan.pdf
appendix11-hydraulic-assessment-report.pdf
appendix12-erosion-sediment-control-plan.pdf
appendix13-waste-management-plan.pdf
appendix14-traffic-impact-assessment.pdf
appendix15-visual-impact-study.pdf
appendix16-economic-benefits-snapshot.pdf
appendix17-noise-impact-assessment.pdf
appendix18-wind-impact-study.pdf
appendix19-archeological-assessment-report.pdf
appendix20-heritage-impact-assessment.pdf
appendix21-biting-insects-management-plan.pdf
appendix22-greenhouse-gas-assessment.pdf
Urbanscope to the Development Consent Authority in September 2021
Below is the appplication that was submitted by Urbanscope to the Development Consent Authority in September 2021. Community submissions are closed except for those who arranged an extension.
Click here to reach the attachments.
Read on …
Currently listed at the Development Consent Authority is:
Friday, 3 September 2021 – closes Midnight Monday, 4 October 2021
Address: Lot 07651 Town of Darwin 25 GILRUTH AVE THE GARDENS Current Zones: MZ (Multi Zone)
Proposed Development: Hotel/motel and serviced apartments with ancillary bar-public and market in 2 x 6 storey and 3 x 1 storey buildings with ground level and semi-basement car parking
Requested Variations:
- Setbacks
- Car Parking
We know this site as Little Mindil, at the end of this article we have all the attachments to make it easier for the community to get access to this information. There was a long campaign to establish the public open space at Little Mindil. If you read the list of consultations that have been carried out we see that community have been omitted to date.
This is foreshore land and should always remain public open space.
This is an essential part of the total public recreational Mindil Beach Precinct, of which the Market site, the Golf Course, Waratah Oval, and the Botanic Gardens are also essential parts.
This whole area, next to the sea at Fannie Bay, is ringed by a high escarpment, which together forms a natural amphitheatre.
The NT Government made an agreement by which the large Little Mindil space was saved for the open relaxed recreational use of the people of Darwin. We need this open space area even more now, with a denser population in CBD.
Is the NT Government now going to change its mind, renege, and abandon the rights of the residents of Darwin at this point in time?
Attachment B – Landscape Concept
Attachment C – Visual Impact Study
Attachment D – Stormwater Management Plan
Attachment E – Engineering Services Report
Attachment F – Hydraulic Assessment Report
Attachment G – Traffic Impact Assessment
Attachment H – Noise Impact Assessment
Attachment I – Desktop Environmental Wind Study
Attachment J – Bar-Public Plan of Management
Attachment K – Archeological Assessment Report
Attachment L – Heritage Impact Assessment
Attachment M – Erosion _ Sediment Control Plan
Attachment N – Preliminary Site Investigation – Contamination
Attachment O – Bulk Earthworks_ Roadworks _ Drainage Plan
Attachment P – Biting Insects Management Plan
Attachment R – PSA Map of Lot 7651
Little Mindil Design Response Package
Attachment T – Council Authority to Submit DA
Little Mindil Architectural Drawing Package
Attachment U – List of Stakeholder Engagement Meetings
Little Mindil – Statement of Effect (R1)
Little Mindil – Statement of Effect (R1) ed note there are two of these in the application?
Morie information to follow.
https://www.abc.net.au/news/2021-09-08/nt-little-mindil-development-darwin-sacred-site/100444474